With growing concerns over COVID-19, the Shire of Broome is endeavouring to keep the community updated with the latest news. For more information click below:
COVID-19 latest
Standard Drawings show the minimum standard that the Shire has adopted with regard to certain types of work. Standards have been developed for works on roads, drainage and other miscellaneous activities.
S00-003 Residential Crossover Locations(PDF, 63KB)
S00-003 Vehicle Crossing Commercial Concrete Crossovers(PDF, 287KB)
S03-001 Rural Crossover(PDF, 85KB)
S13-001 Residential Concrete Crossover(PDF, 951KB)
S09-004 Side Entry Pit(PDF, 90KB)
S09-004 Side Entry Pit Combination Type(PDF, 90KB)
S09-004 Stormwater Manhole(PDF, 70KB)
S09-003 Extruded Kerbing(PDF, 155KB)
S05-002 Proposed Bus Shelter Rural Type(PDF, 174KB)
S06-001 Event Pole Signs Frame(PDF, 80KB)
S07-022 Verge Planting(PDF, 86KB)
S11-001 Bridge Rail(PDF, 67KB)
S12-001 Footpath Drain Crossing(PDF, 70KB)
S12-002 Pedestrian Ramp and Holding Rail(PDF, 205KB)
S13-002 Bus Shelter Type 1 Frederick Street(PDF, 442KB)
S13-003 Bus Shelter Type 2 Cable Beach(PDF, 455KB)
Shire of Broome Footpath Plan(PDF, 771KB)
Guideline for Construction or Reinstatement of Carparks within Shire of Broome Road Reserve Revision 2 May 2014(PDF, 54KB)
Shire of Broome Subdivision Clearance Checklist Template.xlsx(XLSX, 148KB)