Stage 1 of the Walmanyjun/Cable Beach Foreshore Redevelopment is well underway. Construction is scheduled to continue until December 2024, mostly around the Surf Club.
Click here for more information about the project and provisions in place.
Standard Drawings show the minimum standard that the Shire has adopted with regard to certain types of work. Standards have been developed for works on roads, drainage and other miscellaneous activities.
S09-004 Side Entry Pit(PDF, 90KB)
S09-004 Side Entry Pit Combination Type(PDF, 90KB)
S09-004 Stormwater Manhole(PDF, 70KB)
STD-R-001 Footpath Detail(PDF, 300KB)
Subdivisional Footpath Plan(PDF, 13MB)
STD-R-002 Kerb Details(PDF, 236KB)
STD-R-003 Industrial Vehicle Crossover(PDF, 220KB)
STD-R-004 - Residential Concrete Crossover(PDF, 181KB)
STD-R-005 Rural Crossover(PDF, 85KB)
STD-R-006 Crossover Locations(PDF, 63KB)
Guideline for Construction or Reinstatement of Carparks within Shire of Broome Road Reserve Revision 2 May 2014(PDF, 54KB)
Shire of Broome Subdivision Clearance Checklist Template.xlsx(XLSX, 148KB)